Westgate Leisure Centre Chichester circa £215,000 BMS

Renew the existing mechanical and electrical system on site as part of the carbon trust scheme. This particular project incorporated CHP’s, Boilers, chillers and ventilation control of the whole centre. The system installed was based upon Trend controls with graphical front end pc.

Sobel Leisure Centre Islington circa £65,000

Refurbish the existing mechanical system on site as part of the Islington leisure scheme. This particular project incorporated new controls to existing systems, Boilers, chillers and ventilation control of the whole centre. The system installed was based upon Trend controls with graphical front end pc.

Camborne Police Station Camborne circa £21,000

Provide a BMS system to the new police station. This particular system incorporated Heat Pump Technology, solar heating and natural ventilation. The system installed was based upon Trend controls with graphical front end pc.

RBS Shepherd Printing Works circa £25,000

Extend the existing BMS system to incorporate the new generator controls and sub electric metering. This particular system incorporated generator control with DSE load switching lv switch boards the electric metering was via Modbus technology. The system installed was based upon Trend controls with updates made to the existing graphical front end pc. New Generators Revised LV Switch boards

Nat West Banks Local Offices circa £50,000

These particular system incorporate new boiler and pump technology with energy saving controls.The system installed was based upon Trend controls.

Hawkesgarth lodge Whitby circa £20,000

Extend the existing BMS system to incorporate the new heating and ventilation controls. This particular system incorporated new boilers and under floor heating. This project was carried out within a tight 6 week period. The system installed was based upon Priva controls.