Recent Projects

Westgate BMS, Building Managements SystemWestgate Leisure Centre Chichester circa £215,000 BMS
Renew the existing mechanical and electrical system on site as part of the carbon trust scheme. This particular project incorporated CHP’s, Boilers, chillers and ventilation control of the whole centre. The system installed was based upon Trend controls with graphical front end pc.

 

 

 

Building Management SystemsSobel Leisure Centre Islington circa £65,000
Refurbish the existing mechanical system on site as part of the Islington leisure scheme. This particular project incorporated new controls to existing systems, Boilers, chillers and ventilation control of the whole centre. The system installed was based upon Trend controls with graphical front end pc.

 

 

 

Building Management Systems BMS for CamborneCamborne Police Station Camborne circa £21,000
Provide a BMS system to the new police station. This particular system incorporated Heat Pump Technology, solar heating and natural ventilation. The system installed was based upon Trend controls with graphical front end pc.

 

 

 

 

Building Management Systems or BMSRBS Shepherd Printing Works circa £25,000
Extend the existing BMS system to incorporate the new generator controls and sub electric metering. This particular system incorporated generator control with DSE load switching lv switch boards the electric metering was via Modbus technology. The system installed was based upon Trend controls with updates made to the existing graphical front end pc. New Generators Revised LV Switch boards

 

 

 

Nat West Banks Local Offices circa £50,000
These particular system incorporate new boiler and pump technology with energy saving controls.The system installed was based upon Trend controls.

 

BMS - Building Management SystemsHawkesgarth lodge Whitby circa £20,000
Extend the existing BMS system to incorporate the new heating and ventilation controls. This particular system incorporated new boilers and under floor heating. This project was carried out within a tight 6 week period. The system installed was based upon Priva controls.